標題: Discount Nike Air Force One Shoes NDIA
無頭像
LlzmjJ1r
炽天使
Rank: 3

積分 15176
帖子 12132
威望值 0 ♪
天使币 36394 枚
贡献值 0 ☆
爱心值 0 ♡
活跃度 36394 ☼
註冊 2017-10-13
用戶註冊天數 2358
用戶失蹤天數 2065
狀態 離線
發表於 2018-2-18 09:42 
36.57.177.45
分享  私人訊息  頂部
Chief Executive Officer of the National Drainage and Irrigation Authority (NDIA), Lionel Wordsworth, has explained that the sum of monies was increased for the sluices in Wakenaam and Leguan because of the expanded scope of works that are needed.Kaieteur News recently reported that a $20 million contract was awarded for the construction of a drainage structure (sluice) at Amersfort,Wholesale Jerseys, Wakenaam, while $35 million was awarded for the construction of a similar drainage structure (sluice) in Waterloo,Cheap Jerseys, Leguan.However, it was later reported that the money for both these contracts has been increased from $20 million to $25.8 million, while the budgeted $35 million has also been increased to $42.6 million.In responding to queries from this newspaper yesterday, Wordsworth said that in Wakenaam,Cheap China Jerseys Authentic, the old structure is severely eroded and based on technical assessment the structure will have to be shifted inwards to safeguard against erosion, while additional revetment works will need to be added in order to secure the structure unto the sea defense.“There was an increased scope of works which was put out in the bid that went out to all the bidders that participated in the process,Andre Branch Dolphins Jersey,” Wordsworth said.As it relates to Leguan, he said that there is an old structure at the site which has not been functioning for many years. However, he added that farmers are calling for the NDIA to also resuscitate another structure west of Waterloo and thus there is expanded scope of works that will examine and resuscitate the old structure.Agriculture Minister Robert Persaud explained that monies are allocated based on the scope of works originally proposed but this can change when additional works are found to be done.He added that in the National Procurement process, when a contract goes out to tender,Wholesale Adidas Hockey Jerseys, it goes with an engineer’s estimate. This is where the in-house engineer would come up with the projected cost based on the factors available and what the project intends to do. It was noted that the engineers estimate is catered for in the budget.But when the bidders go through the competitive bidding process several persons would have tendered and the lowest bid would be between $5 million and $6 million,Huarache Shoes For Men, above the engineers estimate.This, too, he said, would be a reason for the change in some contract costs.